Projects completed in 2011

А)  CORRIDOR 10 and 10d

1.  Inastallation of APB ( automatic block ) and obtaining of signal-safety devices on 9 road crossings of the section Klisura – Gevgelija......................................................................................2.000.000 Е

For the realization of this project is used previously mounted equipment since the year 1995.The construction was financed from the budget of the RM,while construction works carried out employees of the PE MR Infrastructure.

 

By this project round off the whole technological of the railway of Corridor 10 from Tabanovce to Gevgelija.This system increases the throughput of the railway,because enables more trains to move one after another in the same direction at a safe distance in space between two railway stations,thereby reducing driving time and increases traffic safety.

 

 2.   Integrated communications network...........................................3.520.000 Е

For the realization of this project is used equipment donated from the USA-TDA in optic cable with accompanying equipment,and loan from the World Bank for multiple communications devices.The construction was financed from the budget of the RM for the optical network that carried out employees of the PE MR Infrastructure.

 

This project stretches on the whole Corridor 10 from Tabanovce to Gevgelija on the relation and section Skopje – Volkovo.Important for this project was the coverage with telecommunications connections of the border stations Tabanovce,Volkovo and Gevgelija.

 

The system enables rapid transmission of large amounts of information for the needs of the PE MR Infrastructure,for the needs of some public utilities,as well as part for leasing of external operators with telecommunications services in the RM.Transmission over optical cable using multiple devices completely replace the previous transmission over cooper cables with limited capacity and high degree of depreciation.

 

 

 

3.     Remote traffic management (Telecommands).........2.000.000 Е

For the realization of this project is used a loan from the World Bank and previously procured equipment for adjustment of the signal-safety installations to enable the remote management.The construction is financed from the budget of the R.Macedonia,while construction works carried out employees in the PE MR Infrastructure.This system is installed on the railway line of Corridor 10 from Tabanovce to Gevgelija.The system enables central management of traffic from the command center in Trubarevo,increases efficiency in the operation and the throughput of the railway.The operational service has a complete overview of the overall traffic situation of Corridor 10,and can efficiently and rationally organizes and manages the traffic along the railway line.

 

4.    Overhaul of the railway Negotino – Dubrovo..................................2.000.000 Е

For the realization of this project the financial means were provided from the budget of the R.Macedonia.It is elaborated a repair of the railway line in length of 6.2 kilometers,which were replaced the dilapidated wooden sills with concrete and part of tracks.Thereby enables that in this section of the railway,trains to move at a speed which is projected the railway of 120km/h.

 

5.     Obtaining of signal-safety devices on 7 road crossings of the railway Veles – Bitola of Corridor 10d......................................................700.000 Е

For the realization of this project the financial means were provided from the budget of the R.Macedonia.The construction is in its final phase,whereas the contractor of the works are employees in the PE MR Infrastructure.

By realizing this project is increased the safety in railway traffic,because the population gravitates in that area has 7 additional places provided with signal devices where they can safely pass the railway with a vehicle which is in level with the road.At those places with signal and sound indication participants in the traffic coution about the arrival of the train.

.

6.     Infrastructure management information system..........620.000 Е

This system is financed by a loan from the World Bank.The implementation of the project is in its final phase.The project should provide information and reports on the status and quality of the railway in the whole rail network.With its implementation will be raised to a higher level the regular monitoring of maintance investment of railways and facilities. 

 

BCORRIDOR 8

7.     Obtaining of signal-safety devices on the 14 road crossings of the railway G.Petrov – Gostivar .........................................................2.360.000 Е

This investment is realized by using donated equipment from the USA-TDA.The construction is donated from the budget of the R.Macedonia,whereas the construction works carried out employees in the PE MR Infrastructure.

By realizing this project is increased the safety in railway traffic,because the population gravitates in that area has 14 additional places provided with signal devices where they can safely pass the railway with a vehicle which is in level with the road.At those places with signal and sound indication participants in the traffic coution about the arrival of the train.In this section of the railway annually happens several traffic accidents with deadly consequences,and the benefit of this project is in protecting the population,which every day has the need of communication on both sides of the railway line..

 

8.     Integrated communications network  Skopje – Tetovo

For the realization of this project is used equipment donated from the USA-TDA in optic cable with accompanying equipment,and loan from the World Bank for multiple communications devices.The construction was financed from the budget of the RM for the optical network that carried out employees of the PE MR Infrastructure.

This project stretches beside the whole Corridor 10 from Tabanovce to Gevgelija and the section of Corridor 8 from Skopje to Tetovo.

The system enables rapid transmission of large amounts of information for the needs of the PE MR Infrastructure,as well as part for leasing of external operators with telecommunications services in the RM in that region.

 

9.     Integrated  communications network Tetovo – Gostivar

This project is part of the overall integrated communications network that ended in 2010,but remains lying of optical cable on the the ground of the section Tetovo – Gostivar in length of 25 kilometers.The works will be carried out until the end of the year 2011.

 

10.  Elaboration of technical documentation for Corridor 8 on the section Kriva Palanka – Bulgarian border................................................550.000 Е

For the realization of this project the financial means were provided from the budget of the R.Macedonia.It is elaborated the basic project for the track of the section from Kriva Palanka to the border with the R.Bulgaria in length of 23 kilometers by the firm Balkan Consulting.For the project is made audit,and received a positive report.

 

11.  Elaboration of technical documentation for Corridor 8 of the section Kicevo – Lin ( Albanian border ).................................................850.000 Е

For the realization of this project the financial means were provided from the budget of the R.Macedonia.It is elaborated a conceptual project,Feasibility Study and Environmental Impact Study for the section from Kicevo to Lin in length of 63 kilometers.